Albufeira.com Homepage
Forum Home Forum Home » Tourism / Turismo » Works in Old Town / Obras no Centro Antigo
  New Posts New Posts RSS Feed - Square dug up...
  FAQ FAQ  Forum Search   Events   Register Register  Login Login


Topic ClosedSquare dug up...

 Post Reply Post Reply Page  <12
Author
Message
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27004
Direct Link To This Post Posted: 21/November/2016 at 18:14
Here we go again. Assorted holes in the square near Bank restaurant and just around the corner by Fastnet bar, pictured on Sunday afternoon. No 'elf an safety issues, I poked my lens through the screens.








Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
pyrman View Drop Down
Top Contributors
Top Contributors
Avatar

Joined: 06/December/2012
Location: Kilmarnock, Sco
Status: Offline
Points: 1134
Direct Link To This Post Posted: 23/November/2016 at 11:25
with the roads and various cables, there is hardly a part of Albufeira that isn`t dug up at the mo ...
Pyrman
Back to Top
Jock View Drop Down
Top Contributors
Top Contributors
Avatar

Joined: 07/November/2011
Location: Auld Reekie
Status: Offline
Points: 1331
Direct Link To This Post Posted: 23/November/2016 at 13:57
Are these works repairing damage from the flood?  Or perhaps improving drainage?
It is no coincidence that in no known language does the phrase 'As pretty as an Airport' appear. Douglas Adams
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27004
Direct Link To This Post Posted: 29/November/2016 at 11:37
Fllod damage has long since been fixed. The council received some government money to do some further work on the drains in that part of the town, where the river flows through a tunnel of many years standing. Drainage works definitely. I walked past this morning and men were working down in various holes creating some very large chambers and big new pipes were going in.

I will see if I can get some more pictures in the morning.

More work is planned to help prevent rainwater from cascading down the steep hills into town. Current drains cannot deal with 6" of water falling in as many hours.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27004
Direct Link To This Post Posted: 30/November/2016 at 16:41
The first lot of holes are almost complete, earlier today they were being backfilled and lids put on like this. They have created access points into the tunnel to make it easier to get at blockages as well as laying new larger pipes.



Further along, towards the pier, some nice new and much bigger holes are being dug.





Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
 Post Reply Post Reply Page  <12
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.03
Copyright ©2001-2019 Web Wiz Ltd.

This page was generated in 1,275 seconds.