Albufeira.com Homepage
Forum Home Forum Home » Tourism / Turismo » Miscellaneous / Diverso
  New Posts New Posts RSS Feed - MARINA DE ALBUFEIRA - 2nd phase works start March
  FAQ FAQ  Forum Search   Events   Register Register  Login Login


Topic ClosedMARINA DE ALBUFEIRA - 2nd phase works start March

 Post Reply Post Reply Page  12>
Author
Message
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Topic: MARINA DE ALBUFEIRA - 2nd phase works start March
    Posted: 16/February/2017 at 16:29

From Facebook

ESTÁ A NASCER UMA NOVA MARINA DE ALBUFEIRA - 2ª FASE

 APROVAÇÃO DAS OPERAÇÕES DE LOTEAMENTO DA 2ª FASE DO PLANO DE PORMENOR DO PORTO DE RECREIO DE ALBUFEIRA (MARINA DE ALBUFEIRA)

 • Em reunião da Câmara Municipal de Albufeira de 14 de Fevereiro de 2017, foram aprovadas as operações de loteamento que permitem a emissão dos Alvarás de Loteamento da 2ª fase do Plano de Pormenor do Porto de Recreio de Albufeira (Marina de Albufeira).

 

• Com a emissão dos Alvarás de Loteamento serão constituídos 36 lotes com permissão de edificação de 10.930 m2 de construção destinados a Habitação, 22.379 m2 destinados a Apartamentos Turísticos, 13.060 m2 destinados a comércios/Serviços e 26.680 m2 destinados a Hotéis.

 

• As obras de urbanização deverão iniciar-se no próximo mês de Março, devendo ficar concluídas no prazo de oito meses.

 

• Com a realização das obras da 2ª fase ficará concluído o plano urbanístico projetado em 2007, pelo Prof. Sidónio Pardal, o qual prevê para a segunda fase, uma menor densidade de construção e, quanto aos espaços verdes, uma compatibilização com os espelhos de água e demais equipamentos. Os espaços verdes estão dimensionados por forma a garantir a sua arborização. O plano de pormenor inclui 51% de espaços verdes e 21% de área molhada, encontra-se compatibilizado com o Plano de Urbanização de Albufeira e estrutura verde envolvente, não abrangida por este último.



Which I think translates roughly into:

  • 2nd phase of marina planning agreed with work to start in March 2017
  • Final phase of original 2007 plan
  • Mix of housing, apartments and retail shops
  • New 26,000m2 hotel
  • Road ways and pavements to be completed in 8 months
I'm not sure if they are actually building the apartments/buildings or just selling the planning permission/plots!

These are the original plans 

Back to Top
Sponsored Links


Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 17/February/2017 at 08:39
8 months! Anyone want to bet? I will keep a watch on this.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
pyrman View Drop Down
Top Contributors
Top Contributors
Avatar

Joined: 06/December/2012
Location: Kilmarnock, Sco
Status: Offline
Points: 1134
Direct Link To This Post Posted: 17/February/2017 at 11:49
Great news for the city and marina area ...  and maybe an incentive to finish those half-built eyesores on the east side. From my reading, they will build the lake and infrastructure ... but it is just lots to be set out so far for the other stuff.
Pyrman
Back to Top
Black Cat View Drop Down
Newbie
Newbie
Avatar

Joined: 14/February/2010
Location: Gateshead
Status: Offline
Points: 152
Direct Link To This Post Posted: 17/February/2017 at 14:57
We are over in April and September will have to compare the differences LOL
Back to Top
tonisdad View Drop Down
Senior Member
Senior Member


Joined: 24/November/2010
Location: United Kingdom
Status: Offline
Points: 1060
Direct Link To This Post Posted: 17/February/2017 at 15:40
Originally posted by pyrman pyrman wrote:

Great news for the city and marina area ...  and maybe an incentive to finish those half-built eyesores on the east side. From my reading, they will build the lake and infrastructure ... but it is just lots to be set out so far for the other stuff.

Hope so but no doubt it will be...I`ve started but I won`t finish.
Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 18/February/2017 at 16:58
I'll be glad if they get rid off or finish the "great wall" :-)


I'm flying over tomorrow so will see if anything has started.


Just noticed there is also a new laundry area (washing machines + spinners) in the marina.
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 18/February/2017 at 17:07
 I have closed the previous item on this topic (http://www.albufeira.com/forum/marina-phase-2-construction_topic5921.html) with a redirect to here. And moved the topic from 'Works in the old Town' to a more appropriate location.

All contributions gratefully received as work progresses - or does not!
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 25/February/2017 at 08:54
This is what the phase 2 marina area looks like in Feb 2017...





A NEW MARINA DE ALBUFEIRA IS BEING BORN – 2ND STAGE

APPROVAL OF THE ALLOTMENT OPERATIONS OF THE 2ND STAGE OF THE RECREATIONAL PORT OF ALBUFEIRA DETAIL PLAN (MARINA DE ALBUFEIRA)

• On the 14th of February 2017 on a meeting at the City Hall of Albufeira, the allotment operations were approved allowing the issue of the Allotment Licenses of the 2nd stage of the Recreational Port of Albufeira Detail Plan (Marina de Albufeira).
• With the issue of the Allotment Licenses will be formed 36 lots with building permit of 10.930 m2 of construction meant for Housing, 22.379 m2 meant for Tourism Apartments, 13.060 m2 meant for commerce/Services and 26.680 m2 meant for Hotels.
• The construction work will start in March, being estimate to be concluded within a 8 month period.
• With the accomplishment of the 2nd Stage construction work the urban plan designed in 2007, by Professor Sidónio Pardal, will be concluded, predicting for the 2nd stage a lower construction density and compatibility between the green spaces, the water basins and the other equipments. The green spaces are dimensioned in order to allow their forestation. The detail plan includes 51% of green spaces and 21% of wet area and is compatible with the Albufeira Urban Plan and surrounding green structure, not covered by the last plan.


Back to Top
pyrman View Drop Down
Top Contributors
Top Contributors
Avatar

Joined: 06/December/2012
Location: Kilmarnock, Sco
Status: Offline
Points: 1134
Direct Link To This Post Posted: 25/February/2017 at 13:58
Watch this space .... one might conclude the CM-Albufeira is having difficulty spending all the extra revenue coming from its recent tourist boom ... expect to see more tarting up .. they could buy Oceanville ..
Pyrman
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 26/February/2017 at 11:30
Oceanville was on sale for €1 if I recall correctly - plus the debts, permits and rebuilding cost!

I wonder who is going to occupy those 10,930 sq metres of housing?
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 24/April/2017 at 12:44
Well a few months on, and not much has changed on Phase 2.

The blue fence has been removed, and hundreds of tons of soil have been piled up!

Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 24/April/2017 at 12:53
Here are a couple of images taken from the model in the marina offices - I don't think these are 100% correct as the existing site is not built to this model exactly.




Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 28/April/2017 at 18:33
The scene a few days ago


Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
Algarveaddick View Drop Down
Top Contributors
Top Contributors
Avatar

Joined: 27/December/2008
Location: Portugal
Status: Offline
Points: 5052
Direct Link To This Post Posted: 29/April/2017 at 09:57
When they said "next" March...
Go away Duchatalet
Back to Top
Gillian View Drop Down
Newbie
Newbie


Joined: 19/April/2017
Location: UK
Status: Offline
Points: 8
Direct Link To This Post Posted: 12/June/2017 at 13:02
Hi does anyone on this forum use Suzana da Silva as their lawyer? we have been trying for months to get any reply to e.mails from her. Rang several times always engaged tone. Would be grateful for any information re her or Oceanville. Thanks
Back to Top
 Post Reply Post Reply Page  12>
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.03
Copyright ©2001-2019 Web Wiz Ltd.

This page was generated in 8,414 seconds.