Topic ClosedMARINA DE ALBUFEIRA - 2nd phase works start March

 Post Reply Post Reply Page  <12
Author
Message
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 14/November/2018 at 16:13
In October there was a lot of activity in the phase 2 area - thousands of tons of hardcore have been dumped to build up the level of the land - I suspect to the height of the "wall".

There are two trucks delivering loads every 20 mins and a bulldozer pushing it all around.

The wall has also been tided up and a lot of the rebar exposed - don't know if thats to demolish or to add to!
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 15/November/2018 at 08:37
Yes, I have been seeing stuff going on from out of my window. Time for a nose around I think and some pictures.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 25/November/2018 at 09:29
Took some pictures on Friday, I hope to be to post them either later today or tomorrow. I also saw a truckload of rubble being delivered but nothing much else going on.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 25/November/2018 at 19:04
Some pictures taken on Friday. It's still a bit of a wasteland around there and not much actually going on.

Some subsidence issues will need to be addressed!







The marble kerbstones are still there if you want some!
















Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 27003
Direct Link To This Post Posted: 30/December/2019 at 15:02
Please see topic http://albufeira.com/forum/marina-phase-2-construction_topic5921.html for further updates.

This one now locked to avoid duplication.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
 Post Reply Post Reply Page  <12
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.03
Copyright ©2001-2019 Web Wiz Ltd.

This page was generated in 0,974 seconds.