STADIUM ATHLETICS TRACK BEING REBUILT

 Post Reply Post Reply
Author
Message
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26924
Post Options Post Options   Thanks (1) Thanks(1)   Quote cubsur Quote  Post ReplyReply Direct Link To This Post Topic: STADIUM ATHLETICS TRACK BEING REBUILT
    Posted: 18/November/2018 at 08:26
The council is spending around €300,000 to replace the running track etc at the stadium. It had been in poor condition for years and unsuitable for competition.


Work is scheduled for completion towards the end of January. Other stadium works in the planning stage are a new 'support building' for athletics, refurbishment of the bar (always welcome!) and attention to the roof of the main stand. The changing rooms were re-done during the summer.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
Sponsored Links


Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26924
Post Options Post Options   Thanks (0) Thanks(0)   Quote cubsur Quote  Post ReplyReply Direct Link To This Post Posted: 02/December/2018 at 08:30
Seen yesterday that all the stuff needed for the new track and associated facilities is being delivered ready for relaying etc to begin.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26924
Post Options Post Options   Thanks (0) Thanks(0)   Quote cubsur Quote  Post ReplyReply Direct Link To This Post Posted: 07/January/2019 at 11:01
The 'underlay' is now down and piles of stuff are awaiting the next stage.


Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26924
Post Options Post Options   Thanks (0) Thanks(0)   Quote cubsur Quote  Post ReplyReply Direct Link To This Post Posted: 20/January/2019 at 10:11
The 'tartan' is going down and the old seats are being removed from the main stand.



Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26924
Post Options Post Options   Thanks (0) Thanks(0)   Quote cubsur Quote  Post ReplyReply Direct Link To This Post Posted: 02/March/2019 at 15:29
Progress isn't exactly rapid but a month on, the track is almost relaid.



China and Norway line up on the well kept grass. It was a bit dry, despite sprinkles being on before the kickoff.



The jumping pits have to be done. Meanwhile the repairs to the main stand and installation of new seats continues.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26924
Post Options Post Options   Thanks (0) Thanks(0)   Quote cubsur Quote  Post ReplyReply Direct Link To This Post Posted: 10/March/2019 at 11:23
The red bit round the pitch is now finished. Work is still needed on the jumping pits and throwing circles for hammer and discus, plus renewal of the protective netting. Work continues to repair the main stand and install new seats.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26924
Post Options Post Options   Thanks (1) Thanks(1)   Quote cubsur Quote  Post ReplyReply Direct Link To This Post Posted: 06/April/2019 at 20:29
Track is finished except for the markings. Work continues to take out the old seats, repair the concrete and replace with new seats. The main part of the stand was closed today, we were all down one open end, nearly finished, which meant we all got wet! Club says the new seating should be finished within about two weeks.








Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 10.15
Copyright ©2001-2013 Web Wiz Ltd.

This page was generated in 2,203 seconds.