Just driven down there - way overdue...
|
|
Go away Duchatalet
|
|
lizrod
Newbie Joined: 06/April/2011 Location: Albufeira Status: Offline Points: 32 |
Post Options
Thanks(1)
|
thats good news
|
|
Jock
Top Contributors Joined: 07/November/2011 Location: Auld Reekie Status: Offline Points: 1331 |
Post Options
Thanks(0)
|
I remember there were several holes that the council was looking into.
|
|
It is no coincidence that in no known language does the phrase 'As pretty as an Airport' appear. Douglas Adams
|
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(2)
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(1)
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(1)
|
The works along the Avenida down from the Dolphins towards the marina continues. Most of the trench along the first few hundred metres has now been filled in, but work further along is not so advanced. There is no obvious effect on traffic, with two way working along the other carriageway. I would hope for the sake of your wheels that work on the other side will follow! |
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
Algarveaddick
Top Contributors Joined: 27/December/2008 Location: Portugal Status: Offline Points: 5052 |
Post Options
Thanks(0)
|
Estrada de Santa Eulalia and Rua Jose Fontana in the New Town are also being resurfaced, in fact both are not far from finished.
|
|
Go away Duchatalet
|
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(1)
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(0)
|
Road works are ongoing. One side is closed between the Dolphins and the entrance to the marina although nothing is actually happening. Trafic both ways uses the other side. Beyond there, one side is for traffic towards Portimão. Traffic coming into town is being diverted along the new roads near the marina. |
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(0)
|
Work has now switched to the other side. The scrapy machine has been hard at work. New tarmac is going down. Meanwhile the road surface on the open side at the Dolphins is not so good. A car was stuck there earlier with a puncture .
|
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(2)
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(1)
|
Seems to have come to a halt. The sum total of activity this morning was one bloke with a wheelbarrow and two others unloading a some pipe valves. From the Dolphins down to the marina roundabout trafffic in both directions is using the resurfaced side. The other side remains to be finished. At the Dolphins itself the surface has has been scraped off, leaving a three inch drop as you enter or leave and no signs to warn you. Beyond there, traffic is using both sides, but one side has been scraped but not resurfaced. |
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
Algarveaddick
Top Contributors Joined: 27/December/2008 Location: Portugal Status: Offline Points: 5052 |
Post Options
Thanks(0)
|
As of this morning work started on the eastbound carriageway from the western end of the dual carriageway heading towards the Marina roundabout.
|
|
Go away Duchatalet
|
|
cubsur
Moderator Group Joined: 26/January/2006 Status: Offline Points: 26870 |
Post Options
Thanks(2)
|
Albufeira Resident
www.algarvebus.info public transport information for the Algarve |
|
Post Reply | Page 12> |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You can vote in polls in this forum |